What the 2007 code added, and why it still matters
The 2007 Florida Building Code introduced two requirements that shape every replacement done since. A roof replacement had to include a secondary water barrier, and roof-decking attachments and fasteners had to be strengthened or corrected during reroofing.
Those two requirements are why the Hillsborough County Progress Check inspection exists. It looks specifically at whether roof attachments were strengthened and corrected as the code requires. If your contractor treats that inspection as a formality, that is a signal.
They are also why the Senate Bill 4-D exception has teeth. A roof built to the 2007 code or later already carries the secondary water barrier and the corrected fastening, which is the reason the code is willing to leave the undamaged portion alone.
Product approval is itemised, not general
Clearwater requires a Product Approval Specification Sheet covering every exterior product to be installed, roofing materials included, plus the product approval or NOA cover sheet and installation instructions from the DBPR website for each product.
Largo goes further on precision, asking for a product approval form that lists each roof product to the decimal point, with Florida Product Approvals and installation instructions available on site.
Practically, this means the covering on your roof has to match the covering on the paperwork exactly. Substitutions after approval are a real source of failed inspections.
Before the permit issues
Clearwater requires a Notice of Commencement recorded with the Pinellas County Clerk of Court before the permit is issued for any job valued above $5,000, with a certified copy posted at the job site. Plant City requires a Notice of Commencement before the first inspection and charges a $5 fee for it.
Clearwater also notes that its target for residential plan review is 4 business days, currently extended by up to 15 days due to volume, and that a permit expires if it sits six months without a passed inspection. Build that into your timeline rather than a contractor’s optimism.